Thermal power plant project financing

Bonev Stroy offers project finance for the construction of thermal power plants with a minimum down payment (10%) for our clients: investment loan models.

✓ Project finance and investment lending from Bonev Stroy:

• From €50 million and more.
• Investments up to 90% of the project cost.
• Loan term from 10 to 20 years.

To consider the issue of financing your project, send us the completed application form and project presentation by e-mail.

business, working, laptop-925900.jpg

Thermal power plant project finance: benefits

Historically, the first deal, later called project finance, was struck in the 1930s in Texas (USA) to create an oil company.

In the last decades of the twentieth century, project finance has been widely used in the energy, telecommunications sector and infrastructure projects.

Project finance is based on a system of interconnected participants, formed for the implementation of a specific project. The source of settlement of liabilities and income are the cash flows generated by the project, and its assets are used as collateral.

Thermal power plant project finance differs significantly from other methods of financing business activities and is characterized by a number of features.

Table: key features of project finance for the construction of a thermal power plant.

FeaturesDetailed description
Creation of an independent legal entity called SPV (Special Purpose Vehicle)When implementing an investment project, a project company is created, which attracts the required financial, material and human resources for the construction of thermal power plants. SPV solves financial issues with lenders and investors through the cash flows generated by a specific project.
Limited possibility of debt recovery in case of project failureThe project company does not have significant assets to ensure the return on borrowed funds required for the initial phase of construction of the thermal power plant. The repayment of debts is guaranteed only by the cash flow generated during the operation of the TPP.
Variety of used financial instrumentsProject finance involves the use of different tools, methods and models with the conclusion of contracts with different contractors for the successful and complete implementation of a particular project.
Minimum initial contribution of the project sponsorThe thermal power plant project finance is characterized by a very high ratio of borrowed capital to equity (high financial leverage), since the relative share of borrowed funds can reach 90% of the total project cost.
Long debt maturityThis model assumes a limited useful life of the investment project, which is determined by the duration of contracts or licenses obtained, fuel availability, and other factors.

This financing model is chosen to reduce the risks for the project sponsor (initiator, owner), especially with a large number of investors.

This simplifies the distribution of duties and responsibilities among the participants and, thanks to the transparency of the model, creates opportunities for effective management of the financial risks of the project.

The project finance model is based on the assumption that the debt will be fully repaid from the funds received from the project, without recourse or with limited recourse. It is common practice to use an SPV, the shareholders of which are the project’s investors.

The following parties are involved in thermal power plant project finance:

• Sponsors of the project. These are entities that invest their own or borrowed capital in the construction of a thermal power plant, taking on the associated risks. This includes ministries, state-owned enterprises, financial institutions, private companies and individuals. Sponsors independently determine the amount and timing of the allocation of financial resources provided for the implementation of the project.

• Lenders. These project participants provide loans to finance equipment purchases and on-site work. Most often these are national, foreign or international banking and financial institutions (for example, the World Bank, European Bank for Reconstruction and DevelopmentEuropean Investment Bank).

• Contractors. The contractors are persons performing various types of activities under contracts concluded with the project company. They carry out construction works, the supply and installation of boilers, generators, transformers and other equipment.

• Consultants. These are individuals or companies providing engineering, design, legal, financial and other consulting services.

• Consumers. The consumer group includes individuals and legal entities using products and services created as part of an investment project. The initiators of the project can act as consumers themselves, but if they are independent entities, it is necessary to regulate their relationship with the project company through a contract.

• Insurance Company. This party insures the property of the project company and compensates for losses incurred as a result of various insured events.

• Suppliers. Manufacturers and suppliers provide machinery, equipment and materials required for the construction of a TPP, as well as raw materials and spare parts required for the operation of the facility.

• Construction company. An engineering and construction company develops an investment site in accordance with the terms of the contract and technical documentation.

• Government agencies. The authorities can enter into licensing and concession agreements with the project company, supervise construction during the construction of a thermal power plant, provide tax incentives or other measures to facilitate the development of the project.

In the past decades, the project finance model has rarely been used in the European energy sector and has mainly been implemented to finance wind or solar power plants.

Meanwhile, it can also be useful for financing the construction of gas storage facilities, any power unit and a piece of infrastructure that is a separate business entity.

As the indebtedness of thermal power industry entities grows, this financial model will be used more and more often. Nowadays, project finance is more relevant for small energy companies that have been hit by the growth of renewable energy sources.

factory, night, long exposure-1509853.jpg

The choice of a financing model is based on a financial strategy that covers the activities of a particular company.

The package of documents is usually prepared in cooperation with a professional financial advisor.

Bonev Stroy provides a full range of financial services, including the development of an optimal financing model for energy projects.

In the case of project finance, both the investor and the banks cooperate with specialized companies that conduct due diligence. This analysis includes environmental and market audits (a thermal power plant project is always subject to market risk), as well as an audit of the financial model, insurance and legal audits.

It is also important that the project is implemented on the basis of proven and safe technologies. If the projects are technically complex, financial institutions must additionally perform a technical audit of the project.

When structuring contractual relations, organized according to the project finance formula, risks arising at the construction stage and at the stage of operation of a thermal power plant are shared between the investor, the general contractor and financial institutions.

When analyzing a project, banks assess its risk taking into account numerous objective factors:

• Structure and terms of contracts for the purchase of electricity and heat.

• Compliance of the validity period of contracts for the purchase of electricity and heat with the financing period, consumer reliability and market risks.

• The structure and terms of contracts for the supply of fuel for a thermal power plant.

• The main provisions of the EPC contract with the general contractor, including performance guarantees and proposed fines, as well as the reliability of the contractor, its financial condition and experience in implementing similar energy projects.

• Power unit technology and experience of its application in similar projects.

• Location of the thermal power plant and access to the infrastructure for the transmission of electricity and heat to consumers at minimal cost.

• Environmental aspects of the investment project, its potential impact on the environment, health and well-being of the local community.

• Legal aspects of the project and the possibility of obtaining the necessary permits.

• Experience of the project investor in the implementation of similar projects.

Project finance for the construction of a thermal power plant can be obtained without recourse or with limited recourse to the borrower, as well as in the form of an obligation to cover unplanned costs.
Other forms of investor support are also practiced, especially at the stage of engineering design and construction.

Depending on the risks of the project, at the initial stage, the required level of equity capital is determined, which for most companies ranges from 20% to 40% of the planned investment costs.

Thanks to the use of innovative financial models, Bonev Stroy is ready to offer its clients project finance options that cover up to 90% of the project cost.

The collateral in project finance is the property of the SPV, that is, the assets of the project company that implements the investment.

Financial institutions also enter into direct contracts with key project participants, which allows them to take control of the SPV and continue the project in the event that partners fail to fulfill their obligations.

The financial documentation for project finance is stricter and more complete than for conventional finance models. Unlike corporate finance, project finance focuses primarily on the cash flows generated by the project, such as projected or average debt coverage ratios.

Thus, the key step in organizing project finance for the construction of a thermal power plant is to prepare a clear investment model.

The difficulties in building financial models in energy projects are due to the following factors:

• Possible rise in prices for fossil fuels, which, together with the reduction in the cost of construction technologies for wind and solar power plants, may negatively affect the competitiveness of the project as a whole.

• Uncertainty about costs associated with carbon dioxide emissions and non-compliance with mandatory local emission reduction regulations. For example, the need to install expensive carbon capture and storage (CCS) equipment, which negatively affects economic performance.

• An unforeseen change in thermal energy legislation with a particular focus on changes in the support system and environmental standards. In general, the uncertainty of regulators’ actions creates problems for various energy projects.

• The risk associated with the need to conclude long-term contracts for the supply of fuel along with short-term contracts for the purchase of electricity.

Project finance usually allows the debt maturity to be extended to 10-15 years or more, with debt repayment usually matched to the cash flows generated by the project.

Our partner banks are ready to provide project finance for the construction of TPPs on flexible terms.

Acting as your advisor, Bonev Stroy is ready to develop optimal financial models to attract funding through European banks and investment funds.

Together with our partners, we have successfully implemented dozens of projects in many countries around the world. Today, our experience and network of business contacts will serve the success and prosperity of your energy business.

If you are interested in thermal power plant project finance, read our offer and contact our representatives for more information.